OUTTABOXFuture Forward Workspaces Ltd

Open role

Senior Architect / Design Project Lead

Lead assigned workplace/interior design packages from concept through technical documentation, multidisciplinary coordination and site implementation.

Location
Lagos
Work mode
Full-time remote initially; project/site attendance required; future Lagos office rhythm applies
Reports to
Director, Design & Technical (Michael Ndupuechi); day-to-day project coordination through the assigned Project Manager where applicable
Compensation guidance
₦600,000–₦750,000 / month, depending on experience and final package
Availability
Formal start Monday 2 November 2026. Pre-start design onboarding to be communicated internally.

Key responsibilities

  • Lead assigned design packages end to end
  • Concept development, space planning and material direction
  • Client-ready presentations and design documentation
  • Buildable working drawings and internal QA
  • Coordinate with QS/costing, MEP, procurement and Project Delivery
  • Attend project sites and close design queries
  • Maintain design records and reporting in the Outtabox Network

Apply

Application

We only ask for information relevant to the role. Please do not include details such as age, gender, religion, marital status or photographs.

About you
Location and availability

Are you currently based in Abuja?

Compensation

Open to discussing the final package if the overall role is suitable?

Documents
CV (PDF or Word, max 8MB)
No file selected
Optional work sample (remove confidential data)
No file selected
© 2026 Outtabox Future Forward Workspaces Ltd · Abuja, Nigeria · Outtabox is an equal-opportunity employer. We assess candidates only on job-related requirements.